In Design Bid Under Construction Completed
x x x
Project Status & News
- Current Closures
- Letter to Residents
- Project Flyer
- Project Handout
- Riverside Monthly Newsletter, August 2007
Get a video report on the La Sierra Interchange project.
Public Works
Public Works Replace the existing freeway overcrossing and the railroad overpass with a new 6 lane bridge with dual left turn lanes. The freeway ramps will be widened to 3 lanes while retaining their current configuration. Retaining walls would be constructed along the interchange ramps. The area surrounding the ramps would be landscaped in conjunction with the project.
Click Map for Larger ViewTraffic & Transportation
- Area Traffic Report
- City Compressed Natural Gas (CNG) Fuel Station
- Commuting Agencies
- Department of Motor Vehicles (DMV)
- Downtown Parking Guide
- Parking Tips
- Pay Traffic Fines Online
- Red Light Traffic Safety Program
- Riverside Bicycle Club
- Safe Streets
- Speed Limits
- Traffic Volume Count
- Walk Safe, Drive Smart