Skip to Main Content

University of Illinois Springfield

Utility links

Connect with us:

UIS Links

Student Union University of Illinois Springfield

UIS Homepage

Links

Breadcrumbs

Timeline

Timeline header

Coming Events:

Fall 2016: Anticipated opening date

Spring 2015: Construction begins

To date:

Ongoing: Final design decisions are being made. Focus Groups are meeting to discuss:

  • Leadership in Energy & Environmental Design (LEED)
  • Art in Architecture
  • Gaming and Audio Visual Design
  • Furniture and Interior Design
  • Mechanical, Electrical and Plumbing

April 1, 2014: Illinois Board of Higher Education Approves the Student Union Building Construction at UIS.

January 23, 2014: Board of Trustees formally approved the student union project.

December 10, 2013: Student Union Video “Walk-Through” of what new Student Union may look like

November 7, 2013: Character mapping: Student Union committee looks at interior and exterior colors, textures, and materials for the new student union.

August, 2013: Billboard with architects’ renderings of proposed student union appear on campus

May 2013: Professional Service Consultant chosen (Dewberry Architects from Peoria, Illinois, working with Workshop Architects from Milwaukee, Wisconsin)

March, 2013: Four architectural firms came to UIS to interview for the Student Union project (out of 29 who submitted proposals)

April, 2013: Focus groups with prospective architects begin

April 19, 2012: Students vote on referendum to raise fees to build student union; referendum passes

April 9, 2012: First open forum for the Student Union

March, 2012: Student Union Survey: 800 responses collected

February 15, 2012: Student Union Facebook launches

Leadership lived

University of Illinois Springfield
One University Plaza
Springfield, Illinois 62703-5407
217-206-6600

Text Only Options

Top of page


Text Only Options

Open the original version of this page.

Usablenet Assistive is a UsableNet product. Usablenet Assistive Main Page.